Project Highlights:
- Manufacturing: Produced high-quality ZJ50 drilling rigs, adhering to stringent industry standards.
- Assembly Supervision: Oversaw the on-site assembly of the rigs to ensure proper installation and readiness for operation.
- Commissioning Testing: Conducted detailed commissioning tests to verify the rigs’ performance and safety before deployment.