Project Highlights:
- Manufacturing: Produced high-quality ZJ50D drilling rigs, adhering to stringent industry standards.
- Assembly Supervision: Oversaw the on-site assembly of the rigs to ensure proper installation and operational readiness.
- Repair Upgrades: Implemented repair and upgrade services to enhance the performance and efficiency of the rigs.